Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u829657198/domains/jbiindia.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the so-widgets-bundle domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u829657198/domains/jbiindia.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-paginate domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u829657198/domains/jbiindia.com/public_html/wp-includes/functions.php on line 6121
Prestigious Accomplishments – JBI CONSTRUCTIONS PVT. LTD.

Prestigious Accomplishments

Year Name of Work Comm. Date Client Value (INR)
2005 i.    Construction of Banihal Railway Station Yard
ii.   Ventilation Shaft (33m Depth / 12.5  m Dia) Qazigund
2007 HCC
IRCON – Prime
28 Million
2005 Construction of  420 KV Transmission Line ( KishenPur –Wagoora) 2007 Tata Power 70 Million
2006 Construction of  Open Channel for HRT of Uri-II power Station 2009 HCC
NHPC – Prime
50 Million
2009 PMGSY– Road Construction (20 Kms) 2013 JK Rural Road Dev Agency 180 Million
2009 i.    Construction of Approach to TBM Platform for KishanGanga Power Project
ii.   Open Excavation of 450000 Cum spillway and Other Allied Works  at Kishenganga HEP.
2011 HCC 150 Million
2011 Construction of  35 M high Concrete Face Rock Fill Dam(CFRD) – Gurez 2017 HCC 780 Million
2016 Construction of 190 m Long and 12 M Dia HRT for Karcham Shangtang HEP in HP HP PDC/Patel Engineering 1200 Million
2016 Construction of 230 mm dia Micro piles  for Cable stayed railway Bridge at Anji Khad Bridge in J&K 2019 HCC IRCON :
Prime
700 Million
2023 Construction of Station yard for USBL rail project at Sumber Ramban, J&K 2020 HCC/IRCON 24 Million

Ongoing Projects

Year Name of Work Target Completion Client Value (INR)
Construction of Kishanganga Dam Toe PowerHouse 2.4 MW 2024 NHPC 370 Million